[1]
Hauc, A. et al. 2012. Model for Optimal Project Portfolio for the Construction of Railway Infrastructure on Corridors V and X. Promet - Traffic&Transportation. 22, 1 (Jan. 2012), 29–41. DOI:https://doi.org/10.7307/ptt.v22i1.162.