1.
Huang J, Zhang T, Wei R. Urban Railway Transit Timetable Optimisation Based on Passenger-and-Trains Matching – A Case Study of Beijing Metro Line. PROMTT [Internet]. 2021 Oct. 8 [cited 2025 Aug. 26];33(5):671-87. Available from: https://traffic2.fpz.hr/index.php/PROMTT/article/view/2962