Rekonstrukcija međukolodvora na pruzi Vinkovci-Novska za prolazne brzine 160 km/h
Vol. 3 No. 3 (1991)
Periodical Columns
Downloads
The author deals in this paper with a review of reconstruction of intermediate stations for accommodation to transit speeds of 160 km/hr on the double track section of the Beograd-Zagreb rail on the Vinkovci-Novska route section with reference to the overall issue regarding the introduction of the speeds of 160 km/hr.
Levar, Z. (2012). Rekonstrukcija međukolodvora na pruzi Vinkovci-Novska za prolazne brzine 160 km/h. Promet - Traffic&Transportation, 3(3), 105–108. Retrieved from https://traffic2.fpz.hr/index.php/PROMTT/article/view/1667
Downloads
Download data is not yet available.